![]() The athletic wing was the first phase of construction to open for student and community use after 1-1/2 years of construction. This made way for the construction of a new athletic wing and the general classroom wings. The first half of the existing building that was demolished housed general classrooms, an auxiliary gym, and the pool. To create an educational zone separate from the construction zone, existing modular classrooms were relocated on-site, supplemented by a new 2-story structure of modular classrooms for a total of 40 temporary classrooms. Finding the best location for the construction of a new 1,600-student 9–12 high school to replace the existing school was determined to be in its current location, which required careful planning to minimize disruption. ![]()